top of page
AdobeStock_378797866_edited_edited_edited.png

OUR REFERENCE

We believe that a satisfied customer is the basis of success and a clear proof of quality services.

That is why we focus on an individual approach and tailor-made solutions for each customer.

Reliability and maximum professional approach is our priority.

In almost 11 years of operation, we have experienced almost every project surprise and unconventional solution within the construction solution. We always try to accommodate and look for the most optimal solution.

Thanks to this, we have the opportunity to work with a diverse portfolio of customers from large, medium and small companies.

Together with our partners, we implement countless interesting projects in various fields and professions.

We are proud to be a part of these spectacular projects and look forward to more.

Conica cz
Conica cz
sabroli_chem
Pavel Sádlo.png

CEO, CSO

New ŠKODA Auto paint shop - Mladá Boleslav

The Škoda car company has opened a new paint shop at its main plant in Mladá Boleslav, which should be able to paint up to 168,000 cars a year. The total painting capacity of the car company will thus increase to 812,000 vehicles per year, which should contribute to shortening waiting times for new Škoda cars. The new building of the paint shop, which required an investment of 214.5 million euros, measures 276 meters in length, from 60 to 140 meters in width and 35 meters in height. Inside, we find a total of 7 floors - 3 main concrete floors and 4 metal mezzanine floors. The floor area is 25,094 square meters, which is roughly three football fields. The gross volume of the building is 828,058 cubic meters, which is about 265 Olympic swimming pools. The building was unofficially launched already in October 2017, when excavation work began. The foundation stone was laid in December of the same year, technology installation began in June 2018, the approval process began in January 2019, and the first car was painted here on June 3, 2019. Painting has actually been going on for a few months already, but the numbers are constantly increasing. While in the first weeks it was units of pieces per day, today production is around 200 vehicles per day. By the end of the first quarter of 2020, however, production should be at full speed, which means painting around 700 cars a day! The new paint shop is equipped with a number of new technologies as well as a high degree of automation.

Retention reservoir Vinice - Pilsen

Construction of a large retention tank on the Vinice housing estate for approximately 130 million crowns. It is a retention tank, which is primarily intended to prevent untreated water from the sewers from entering the river during torrential rains. The underground structure has a volume of six thousand cubic meters and was completed in 2022 in a joint effort with the STRABAG company.

Reconstruction of the National Museum - Prague

National Museum_edited.jpg

We were part of the general reconstruction of the historical building of the NATIONAL MUSEUM.

And many other projects...

OUR PRODUCTS

  • Instagram
  • Facebook
  • Youtube
  • TikTok
  • Twitter

©2024 by SABROLI GROUP

bottom of page